Concrete Calculators
Every concrete job starts with the same question: how much do I actually need to buy? These calculators answer it in bags, cubic yards and dollars, using the bag yields Quikrete and Sakrete publish, not guesses.
Concrete Bag Calculator
How many 40, 60 or 80 lb bags of concrete you need, and what they'll cost.
Calculate →
Concrete Slab Calculator
Cubic yards of ready-mix for a slab, plus the bag count if you mix it yourself.
Calculate →
Concrete Volume Calculator
Cubic yards and cubic feet for any pour shape.
Calculate →
Concrete Block (CMU) Calculator
Blocks and mortar bags for a block wall.
Calculate →
Rebar Calculator
Rebar pieces and grid layout for a slab.
Calculate →
Post Hole Concrete Calculator
Bags per post hole or sonotube footing.
Calculate →
Buying concrete: bags or ready-mix?
Bagged concrete and ready-mix are the same material bought two ways, and the crossover point is about one cubic yard. A cubic yard is 27 cubic feet. That's 45 bags of 80 lb mix, 60 bags of 60 lb, or 90 bags of 40 lb, all of which you would mix one at a time. Below roughly half a yard, bags are simpler and cheaper: no delivery fee, no minimum load, no clock running on a truck. Above a yard, ready-mix wins on effort and usually on price, and suppliers round orders to the nearest quarter yard.
Which calculator fits your job? For a flat pour, start with the Concrete Slab Calculator. It gives cubic yards for the truck and the bag count side by side. Mixing it yourself? The Concrete Bag Calculator works from any rectangular pour. Odd shapes and round footings belong in the Concrete Volume Calculator, and posts and deck footings in the Post Hole Calculator. Building with block instead? The Concrete Block Calculator counts blocks and mortar bags from the wall's area, and the Rebar Calculator lays out the steel grid for a reinforced slab, lap splices included.
Whatever the pour, order a little more than the bare volume. Ready-mix industry guidance is to order about 4–10% extra for spillage, uneven subgrade and forms that spread. Running short mid-pour is the expensive mistake, not a small leftover.
Frequently asked questions
How many bags of concrete are in a cubic yard?
45 × 80 lb bags, 60 × 60 lb bags or 90 × 40 lb bags. Those counts come straight from the manufacturers' published yields: an 80 lb bag makes 0.60 cu ft of placed concrete, a 60 lb bag 0.45 and a 40 lb bag 0.30.
When should I order ready-mix instead of bags?
Around one cubic yard. Below that, bag minimums and delivery fees make ready-mix poor value; above it, mixing 45+ bags by hand costs more in time and consistency than the truck. The slab and volume calculators show both numbers so you can compare.
How much extra concrete should I order?
About 4–10% over the exact volume, the ready-mix industry's own ordering guidance, to cover spillage, over-excavation and form movement. Every calculator here has a waste allowance for exactly that.